Project documentation often gets left until the end. The project has shipped, everyone is tired, and the person who knows everything leaves in a fortnight. Someone opens a blank document, pours in whatever comes to mind, and six months later nobody can find how to restart the order import or why a particular rule was coded that way.
I work alone, on short engagements, and each one ends with a documented handover. By design, I leave. What I leave behind has to hold up without me. I do not offer managed services or long staff-augmentation contracts, so documentation is the only continuity I can give a client. Here is what I put in it, how I organise it, and what it cannot replace.
01What handover documentation has to make possible
I ask myself one question: can the person taking over, without calling me, keep the project running, fix it when it breaks, and change it without undoing what was decided?
The UK government's Service Manual makes this a requirement: you need a plan to pass knowledge from contractors to the rest of your team, especially when moving from one phase to the next or changing supplier. It lists three ways to do it: pairing, sessions where contractors share what they know, and keeping the documentation in good shape. It also advises working only with suppliers who are prepared to pass on what they know. I think that is a healthy standard, including when the supplier is me.
A good handover is not measured in pages. It is measured by the number of questions nobody needs to ask me any more.
02The four kinds of documents to leave
The most useful thing I have read on the subject comes from Daniele Procida. In his talk at PyCon Australia, he explains that there is no single thing called "documentation", but four, each meeting a different need. Adding material in the wrong place, he says, makes the whole thing worse and harder to maintain. His framework, Diátaxis, names them: tutorials, how-to guides, reference and explanation. It was designed for software, and it fits a project handover very well.
How-to guides
These are the routine tasks: publishing an article, restarting a feed that failed, adding a user, renewing a certificate. Each guide has a title that names the task ("How to restart the order import"), followed by a list of steps. No history, no justification. Procida makes a point about titles, and he is right: people look for a guide at the moment they have the problem.
Reference
The exact inventory of the system: the tools, the access rights and who holds them, the settings, the environment variables (without their secret values), the feeds between tools, and which system is the source of truth for each type of data. It is dry and it has to be correct. Wrong reference material is worse than none, because people trust it.
Why decisions were made
This is what gets lost fastest. The architectural decision record framework published by the Government Digital Service offers a template for recording a decision: title, date, status, context, decision, consequences, stakeholders consulted, links. I use it well beyond architecture. "Why stock levels come from the ERP and not the website" deserves a record. Without one, the next person will undo the rule thinking they are fixing it.
A first walkthrough
One page for the newcomer: where to start, what to open, which task to do first to build confidence. It is the shortest document and often the most read.
03Write during the project, not in the last week
Documentation written at the end is a reconstruction from memory, so it is incomplete. I write at the moment I decide or do something.
On an integration between an ERP and an online store, the specification changed at almost every meeting. I kept it moving version by version, so that everyone was talking about the same document. By the end, that versioned specification, with its dated changes, was already half of the handover. I describe the method in my article on writing an integration specification.
I add documentation to what counts as finished. The Scrum Guide defines the Definition of Done as the formal description of the state of the Increment when it meets the quality measures required, and says that an item which does not meet it cannot be released. If "guide written and reviewed" is part of that definition, documentation moves forward with everything else instead of piling up as debt.
04How I do it at the end of an engagement
My content machines, including the one that produces this blog, are my testing ground. They have to run without me, and what keeps them going is their documentation.
In practice, I leave:
- reference files a person can read: the voice (who is speaking, to whom, in what tone), the closed list of facts that can be used, the rules, the translation brief;
- a configuration file where every block carries a comment explaining what it does, so you know what you are breaking before you change it;
- a versioned calendar that acts as the source of truth: each topic, its status, its note;
- a delivery summary that also says what could not be done.
That last point matters most to me. A handover that lists only what worked hides the gaps, and the next person finds them in production. I would rather write "the keyword research could not be done, and here is why" than let anyone believe it happened.
Another habit: when a reviewer corrects something, the correction becomes a written rule rather than a manual fix. I explain this in the article on my content machine. A written rule can be handed over; a habit in my head leaves with me.
05Test the handover before anyone leaves
Untested documentation is a hypothesis. Before I leave, I run a simple exercise.
- I pick a routine task, for example publishing a piece of content or restarting a feed.
- The person taking over does it alone, with the documentation, while I watch without stepping in.
- Every time they hesitate or ask me something, I note where.
- I fix the document, not the person.
- We repeat with a less frequent task, ideally a simulated failure.
I also check access. The same UK manual says contractors should be given only the access they need, with a process to remove it. On the day I leave, the client must hold every admin account, and mine must be closable without breaking anything. It is the same logic as a calm go-live: you rehearse before the day.
06What documentation does not replace
I do not want to oversell this. It has limits.
Documentation goes stale. Procida says it about wikis: they invite people to throw everything in, and keeping a structure takes constant upkeep. If nobody is named as owner of each document after I leave, it will be wrong within a year. I tell the client so, and I ask for a name before the engagement ends.
It does not replace someone who can make decisions. A guide explains how to restart a feed, not whether to change supplier. If the project has no internal owner, even a careful handover will not be enough. I raise the same point when I write about working with an IT services firm.
And it has a cost. Writing as you go takes time that I include in the engagement, and the client pays for it. On a project of a few days, I scale it down: one guide per routine task, the access list, the three decisions that matter. Not a full manual.
07Where to start on Monday
If a project is ending soon on your side, open a document and create four headings: how-to, reference, decisions, first walkthrough. Under each, list what already exists and what is missing. Then ask the person who will take over to carry out a routine task with what you have. Wherever they get stuck tells you where to start.
If the project is just starting, put documentation in your definition of done from the scoping stage. That is how I work on my engagements, and the portfolio shows the projects where I have done it. If your situation is different, we can talk about it.